The maintenance of Central Radio Network
Communication Station
#1st mission
December 3, 2006

Stage #
6
 
The
70 meters
Heliax Coaxial Cable
was
respectively received under kind support of Mr. Kanchit whose just perceived
WFCC attempt on the construction of
the Central
Radio Network of Thungyai Naresuan
which
is the principal structure to support site management, protection, and
educational research.
 
A
quarter past 1, WFCC arrived the Hermit Hill central radio communication
station. After inspected, we found some damage caused by expiration of some
accessories, and some accessories burnt due to overload usage.
 
Electricity current in
Hermit
Hill central radio communication station supplied by solar cell system on
hilltop which has underground connection to
controller charger;
DC current supplies to radio communication and lighting at basement of the
station, and, AC current supplies for lighting inside the station shaft and to
other electrical equipments.

After discussion, WFCC technicians; Chai and Keng agreed to adjust the
electricity system for more stable and effectiveness;
to increased battery
voltage, to installed
breaker, as well as to
improved electricity
circuit.

Chai and Keng separated for
their specialist, assisted by Koh, Jee
Songkalia wildlife station
officer,
and Ball the volunteer.
  

It was
the first time of Keng and Jee to see each other. For this mission, both of them
are
climbers. After well preparation, they started to climb up the radio post leaded
by Mr. Keng. On such high work was very dangerous that even how experienced the
climber was, he shall pay most concentration on it. Even no dangerous accident
this time, Mr. Keng took a time to sit still as he had got hurt on his leg since
before he came to the mission and got cramp on his right leg at the height.
 
During his high work, we; I and Chai, did not realize what happening until the
high mission finished. It was his lucky, accompanied by his over 20 years
experience anyhow.
 
After high work connection,
Bo and Jee cabled to the station inside, set up and tested.
 
After
the maintenance mission of electrical and radio communication system completed,
Chai set up the new satellite tv receiver in replace the old damaged one. After
test and all functions were effective, it was time to dinner among the
moonlight.
  
That night, Koh;
assisted by Uncle Panom the head of Sesawo station, prepared a primitive plate
but nice test. Perhaps by tired and hungry, or by warm friendship in a nice
atmosphere including the chef's heart filled in. Howsoever, it shall be
another wonderful moment we hope the love of nature could deeply note to memory of all the
volunteer and may fulfil their lives and cured their
heart in the arms of nature whenever they feel of its existence.
Surin / report
Translated by
Nutthinee Jerachasilp
Commemorative
Construction Projects
to Celebrate 30th Anniversary of
Thungyai Naresuan Wildlife Sanctuary Establishment
The
Central Radio Network Communication Station Construction
|
|
|