Central Radio Network Station : Thungyai : Western Forest Conservation Club : WFCC
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The entrance to Mr. Toe's location where the central radio network station of Thungyai was produced.
Plan of the central radion network station designed by Mr. Tawet Utwichai was calculated by Mr. Toedsak Pattarawani , head of WFCC front construction division.
Mr. Toedsak spent 2 days painting all pieces of iron rods before the production process begun.
The 8 support poles of the radio stations under production.
The end of 8 support pole of the radio stations being cut to fit the 8 concrete poles in order to extend the hight of the support poles.
connector designed by Mr. Toedsak to enhance the assembly process which bolts will go to the bush and strengthen the iron structure.
design of iron rod cutting to fit and support each other.
after 10 days of the production , the structure assembly test was successful.
connections of support poles and beams.
the idea of the knock down iron structure was from long experiences of the construction in the wildlife sanctuary where thousands of problems occurred.
In the forest where there is no facilities , a lack of one bolt or insufficient needed construction materials may lead to the failed mission.
The truck of the wildlife sanctuary helped transporting the iron structure of radio station and also transported the long dream of all conservators and rangers of Thungyai to see its own central radio network station which will enhance the sustainable conservation of the wildlife sanctuary.
.
The Central Radio Network Station Construction
Stage#4 phase2
The entrance to Mr. Toe's location where the central radio network station of Thungyai was produced.
better viewwith Internet
Explorer version 4.0 or higher resolution 1024x768 or higher
Copyright 1995 by WFCC 151/11-12 Rajavidhi Road , Prapathomchedi ,
Muang , Nakhonpathom , Thailand 73000
Tel66+34210453
Fax 66+13042034 email :
info@thungyai.org msn :
wfcc1@hotmail.com
Web design byCentroid's Web Syndicate
Service
Warning: The Image on this site are protected by digital watermark technology.
All rights reserved .Reproduction in whole or in part in any form or medium
without express written permission of WFCC is prohibited.