The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
The Central Radio Network Station Construction
Stage#4 phase2
on the mountain top, space with shade was limited so shade under the truck was an ideal place to lunch.
the young rangers were at ease after lunch.
Mr. Tawet who designed the building helped tighten nuts.
Mr. Songkram , volunteer , travelling 1,000 kilometer from his home in Srisaket near Cambodia border to Thungyai which was next to Mayanmar, also joined the mission.
On the afternoon the construction gradually proceed , though the temperature rised up to 38 degree celsius , the team was still steady to its aim.
Polymer sheet was another new material that Mr. Tawet assigned and intended to be installed with the building .
Mr. Tawet was monitoring the polymer installation with the iron frame which Mr. Toedsak produced .
The installation process of polymer sheet took us more than an hour to finish because no one knew how it should be installed with aluminium bar and rubber filling that came in the box with the polymer sheets.
trial and error was the way they made it , silicone was injected into holes and gaps to protect the leak from the rain .
final step was to take off the plastic cover.
The iron frame was 4.20 meter width and needed many men to lift up.
with the help of the lock and support which was designed by Mr. Tiedsak , the installation of polymer frame got no difficulties.
before sunset , all work of structure installation was completed which made the team surprised when look at the building for they had done it only in one day .
after sunrise , the team walked down the hill and got up on a truck headed to Sesavo protection station , 4 kilometers away , where they had set camps .
Sun set had never been so beautiful as today since the central radio station construction of Thungyai started.
.
The Central Radio Network Station Construction
Stage#4 phase2
on the mountain top, space with shade was limited so shade under the truck was an ideal place to lunch.
better viewwith Internet
Explorer version 4.0 or higher resolution 1024x768 or higher
Copyright 1995 by WFCC 151/11-12 Rajavidhi Road , Prapathomchedi ,
Muang , Nakhonpathom , Thailand 73000
Tel66+34210453
Fax 66+13042034 email :
info@thungyai.org msn :
wfcc1@hotmail.com
Web design byCentroid's Web Syndicate
Service
Warning: The Image on this site are protected by digital watermark technology.
All rights reserved .Reproduction in whole or in part in any form or medium
without express written permission of WFCC is prohibited.