It was 12th August 2006 during the Solar Cell Installation Project at Maharaja Wildlife Protection Station. The damaged photovoltaic solar panel of Tinuay Wildlife Protection Station was delivered in return to Thungyai Naresuan after repaired.
The photovoltaic solar panel was previously stated on rooftop of the office of Thungyai Naresuan, supplying electricity to batteries in radio operation room. By the time it got damaged, Mr. Erb Cheongsa-ard; the chief of Thungyai, handed in and asked WFCC to serve maintenance since July 2006. After inspection, WFCC found the diode got burnt, probably by thunderbolt or wrong connection and damaged the PV circuit. Its damage condition was similar to what happened to the solar cell panel of Yuyee Radio station of Huai Khakhaeng WS. which WFCC had served maintenance on the beginning of this year.
Mr. Supachai sourced and supplied PV spare parts and gave Mr. Aun instructions of the PV maintenance procedure. Mr. Aun repaired and inspected its performance for assurance, until all are in function, readily to be returned. By the mission of the #6 stage of Maharaja Solar Cell installation Project, the panel was wrapped and finally transported back for use.
Surin / reported
|
|||
|
|
||||
|
About WFCC Activities Wildlife Sanctuary Bird Photo Gallery Support Projects Main Page
|
||||